Skip to content

Dirt and concrete removal in Campbell & the South Bay

Broken concrete, brick, rock, dirt, sod and roofing shingles. These are heavy, so they’re priced by the cubic yard instead of the flat load list.

from $200per cubic yard. A cubic yard is about a 3×3×3 ft pile.

Open 7 days a week, 7am–7pm. Same-day pickup when available.

Priced by the cubic yard

Heavy materials fill a trailer's weight limit long before its space, so they're not on the per-load list. These are starting prices; the photo sets the final one.

  • Concrete, brick, rock

    from $300

    per cubic yard

  • Dirt, sod

    from $200

    per cubic yard

  • Roofing shingles

    from $250

    per cubic yard

How the final price is set

Heavy loads are limited by trailer weight; big jobs may take multiple trips. Final price after we see a photo.

Travel fee may apply for Livermore and Santa Cruz.

See all pricing

Price-beat guarantee

We'll beat any written quote by $10: same items, from a junk removal company, within 30 days.

  • The quote is in writing, from a junk removal company.
  • Same items.
  • The quote is less than 30 days old.
  • We beat it by $10.

Before we come

  • Measure the pile roughly. A cubic yard is about a 3×3×3 ft pile.
  • Keep concrete, dirt and green waste in separate piles if you can, and tell us if they’re mixed.
  • We haul concrete that’s already broken into pieces we can lift.

Where it goes

Clean concrete, brick and rock get crushed into base rock, and clean dirt is reused as fill. Disposal sites charge less for clean loads than mixed ones, so keeping them separate matters.

Dirt & concrete questions

How much does dirt and concrete removal cost?

By the cubic yard: concrete, brick, rock from $300, dirt, sod from $200, roofing shingles from $250. Heavy loads are limited by trailer weight; big jobs may take multiple trips. Final price after we see a photo.

Why isn’t it on the flat price list?

The flat list is by how much space a load takes. A trailer of concrete hits its weight limit long before it's full, so heavy materials are priced by the yard.

How big is a cubic yard?

A cubic yard is about a 3×3×3 ft pile. Text a photo with something for scale and we'll estimate it.

Where we haul

Campbell · Los Gatos · Saratoga · Monte Sereno · San Jose · Cupertino · Santa Clara · Sunnyvale

Also Mountain View, Los Altos, Los Altos Hills, Palo Alto, Menlo Park, Atherton, Portola Valley, Woodside, Milpitas, Fremont, Livermore, Santa Cruz and surrounding areas. Travel fee may apply for Livermore and Santa Cruz.

Pile of concrete? Send a photo.

Open 7 days a week, 7am–7pm

Game Day Hauling

Based in Campbell, CA

Where we haul

Campbell · Los Gatos · Saratoga · Monte Sereno · San Jose · Cupertino · Santa Clara · Sunnyvale

Also Mountain View, Los Altos, Los Altos Hills, Palo Alto, Menlo Park, Atherton, Portola Valley, Woodside, Milpitas, Fremont, Livermore, Santa Cruz and surrounding areas. Travel fee may apply for Livermore and Santa Cruz.

© 2026 Game Day Hauling